Project Overview
OLG Engineering were commissioned to deliver the Detailed Design package for a £250m facility to store low level nuclear waste at Sellafield. The scope of works included:
- The control of the master P&ID’s
- BIM Control & meta data
Detailed Design for the Piping systems, Stress Analysis, Civil, Structural and Electrical & Instrumentation Engineering, act as the Technical Authority.
Project Review
This 3 year project peaking at 60 people was delivered on NEC 3 Contract providing Project Management, Planning, Reporting and Document Control.